... | @@ -22,7 +22,7 @@ To apply for assessment projects need at list to fulfil the following requiremen |
... | @@ -22,7 +22,7 @@ To apply for assessment projects need at list to fulfil the following requiremen |
|
* Typical files encompass: .stl-files for 3D-printing, technical drawings for PCB production, wiring schemes
|
|
* Typical files encompass: .stl-files for 3D-printing, technical drawings for PCB production, wiring schemes
|
|
* **Bill of Materials (BOM) provided**
|
|
* **Bill of Materials (BOM) provided**
|
|
* A full list for all parts required to build the product
|
|
* A full list for all parts required to build the product
|
|
* Assembly instructions provided
|
|
* **Assembly instructions provided**
|
|
* Basic instructions
|
|
* Basic instructions
|
|
* Professional experience can be required to use the instructions
|
|
* Professional experience can be required to use the instructions
|
|
|
|
|
... | | ... | |